OPUD Blog

News and events from OPUD

  • Home
    Home This is where you can find all the blog posts throughout the site.
  • Categories
    Categories Displays a list of categories from this blog.
  • Tags
    Tags Displays a list of tags that has been used in the blog.
  • Login

SOLAR Project at the WWTF

Posted by on in Wastewater Department
  • Font size: Larger Smaller
  • Hits: 176886
  • Subscribe to this entry
  • Print

solar-04

3908 Mary Avenue

The OPUD solar project at the Olivehurst wastewater treatment plant came online in July of 2012. The 5-acre facility produces approximately 840 kilowatts of electricity or about 1800 megawatt hours per year. The system incorporates 5,253 photo voltaic modules.

The estimated value of the power produced is $321,663 per year. The system is a ground mount tracking solar system, which means the panels rotate with the position of the sun to maximize production. OPUD estimates is will save $2.8 million in electricity costs over the next 20-years of Olivehurst wastewater solar array operation.

The solar array at the OPUD main office at 1970 9th Avenue begins construction September 22, 2012

Tagged in: new tag solar
Trackback URL for this blog entry.